Help me plssssssssssssssssssss

Help Me Plssssssssssssssssssss

Answers

Answer 1

Answer:

(2,0)

Step-by-step explanation:

5x + 9y = 10

4x -3y = 8  If I multiple this second equation all the way through by 3, then the y's would cancel out when I add the equations together.

12x -9y = 24  multiplied the second equation through by 3

5x + 9y = 10  Add the 2 equations together

17x         = 34  Divide both sides by 14

x = 2

Plug 2 in for x for either of the two original equations and solve for y

5x + 9y = 10

5(2) + 9y = 10

10 + 9y = 10  Subtract 10 from both sides

9y = 0  Divide both sides by 0

y = 0

(2,0)


Related Questions

The sides of a triangle are 10 cm, 8 cm, and 10 cm. Classify the triangle.

Answers

If two sides of the triangle is congruent then the triangle is known as isosceles triangle.

What is the triangle?

The polygonal shape of a triangle has a number of sides and three independent variables. Angles in the triangle add up to 180 °.

The two triangular legs and their opposing angles are congruent in an isosceles triangle.

In the given triangle, the sides of a triangle are 10 cm, 8 cm, and 10 cm.

In the triangle, the two sides of the triangle are congruent.

If two sides of the triangle is congruent then the triangle is known as isosceles triangle.

More about the triangle link is given below.

https://brainly.com/question/25813512

#SPJ1

Brainliest + ten points to first correct answer! word problem

The project manager for the state department of highways has two beds for the resurfacing of a 10 mile stretch of highway. The first company gives a bit of $120,000 per mile and will guarantee the web for eight years. The second company bids the word for $150,000 per mile using a new asphalt material made from used tires. The second company will guarantee the work for 12 years. Determine the price per mile per year for each company and decide which company should get the contract based on the least expensive price per mile per year.The project manager for the state department of highways has two beds for the resurfacing of a 10 mile stretch of highway. The first company gives a bit of $120,000 per mile and will guarantee the web for eight years. The second company bids the word for $150,000 per mile using a new asphalt material made from used tires. The second company will guarantee the work for 12 years. Determine the price per mile per year for each company and decide which company should get the contract based on the least expensive price per mile per year

Answers

Answer:

The second company should get the contract.

Question

The project manager for the state department of highways has two beds for the resurfacing of a 10 mile stretch of highway.

Reason

Based on the least expensive price per mile per year, the second company should get the contract. This is because the price per mile per year for the second company is lower than the price per mile per year for the first company.

The first company gives a bit of $120,000 per mile and will guarantee the web for eight years. The second company bids the word for $150,000 per mile using a new asphalt material made from used tires.

The second company will guarantee the work for 12 years. Determine the price per mile per year for each company and decide which company should get the contract based on the least expensive price per mile per year.

The project manager for the state department of highways has two beds for the resurfacing of a 10 mile stretch of highway. The first company gives a bit of $120,000 per mile and will guarantee the web for eight years.

The second company bids the word for $150,000 per mile using a new asphalt material made from used tires. The second company will guarantee the work for 12 years.

Determine the price per mile per year for each company and decide which company should get the contract based on the least expensive price per mile per year

The first company will charge $120,000 per mile for the resurfacing project, and will guarantee the work for 8 years. The second company will charge $150,000 per mile for the project, and will guarantee the work for 12 years.

To determine the price per mile per year for each company, we need to divide the total price by the number of years. For the first company, this would be $120,000 / 8 = $15,000 per mile per year. For the second company, it would be $150,000 / 12 = $12,500 per mile per year.

Based on these calculations, the second company offers the least expensive price per mile per year, at $12,500 per mile per year. Therefore, the project manager should choose the second company to receive the contract.

Can you name the angle pairs and type the correct code? Please remember to type in ALL CAPS with no spaces.

Answers

Answer:

AGDB

Step-by-step explanation:

Pair 1: Alternate interior

Pair 2: Alternate exterior

Pair 3: Same-side interior

Pair 4: Same-side exterior

A concrete drain is 10m long, with an outside diameter of 1m and an inside diameter of 0.8m. Determine the volume of the concrete required to make the drain, to the nearest tenth of a cubic metre

Answers

Answer: To calculate the volume of the concrete required to make the drain, we need to find the volume of the cylinder formed by the outside diameter of the drain and subtract the volume of the cylinder formed by the inside diameter of the drain.

The formula for the volume of a cylinder is:

V = πr^2h

where V is the volume, r is the radius of the base of the cylinder, and h is the height of the cylinder.

The radius of the base of the outside cylinder is 0.5m (the diameter of 1m divided by 2) and the height is 10m. The radius of the base of the inside cylinder is 0.4m (the diameter of 0.8m divided by 2) and the height is also 10m.

So the volume of the outside cylinder is:

V = π * 0.5^2 * 10 = 15.7 m^3

and the volume of the inside cylinder is:

V = π * 0.4^2 * 10 = 12.6 m^3

To find the volume of the concrete required to make the drain, we subtract the volume of the inside cylinder from the volume of the outside cylinder:

15.7 m^3 - 12.6 m^3 = 3.1 m^3

So the volume of concrete required to make the drain is approximately 3.1 cubic metres. To the nearest tenth of a cubic metre, this is 3.1 m^3.

Complete the equation describing how
x and y are related.

Answers

Answer: y = 1x+4

the related between the x and y is x plus one and y plus 4

Step-by-step explanation:

Is the line through points P(8, 4) and Q(6, –1) parallel to the line through points R(1, –4) and S(4, 5)? Explain.

Answers

Answer:

No, the lines are not parallel

Step-by-step explanation:

They are not parallel because the slopes of the lines are not equal.

-3x²+x+ 5 = 0
A.-3+ 24
6
B.-5+√8
2
C.-1+√61
-6
D. 3+√12
10
K

Answers

Answer:

c is your answer

Step-by-step explanation:

x = 1 +_ √61/6

can you solve please

Answers

I believe y is either 7 or close to that number because it is quite clear that both of the sides are not equal but at the same time there isn’t a huge difference, if you want to be sure just use a ruler instead

Find the midpoint of the segment with the following endpoints
(5,5) and (1,1)

Answers

The midpoint of the segment given (5,5) and (1,1) is (3, 3).

What is midpoint?

In geometry, the midpoint is the middle point of a line segment. It is equidistant from both endpoints, and it is the centroid both of the segment and of the endpoints. It bisects the segment.

Coordinates of the midpoint of the line joining the points (x₁,y₁) and (x₂,y₂)= [(x₁ + x₂)/2 , (y₁ + y₂)/2].

The midpoint of the line segment with endpoints (5,5) and (1,1)

= [ ( 5 + (1))/2 , ((5) + 1)/2 ]

= [ (6)/2 , 6/2 ]

= [ 3, 3

Therefore, the midpoint of the line segment with endpoints is (3, 3).

Learn more about the midpoint at: https://brainly.com/question/12223533

#SPJ1

You manage a staff of 9 employees. Each employee has equally done an excellent job this year. If upper management has allotted a bonus for your department of $30,000, what dollar bonus amount would each employee get if divided equally (round to nearest dollar)?.

Answers

The amount that each employee will get out of the bonus to your department will be $3,000.

What will each employee get?

You manage a staff of 9 employees in your department which means that there are 10 people in total.

The amount that each person will get from the bonus will therefore be:

= 30,000 / 10 employees

= $3,000

Find out more on bonuses at brainly.com/question/933169.

#SPJ4

Find the nth term of this quadratic sequence
2, 8, 18, 32, 50, ...

Answers

The nth term of the given quadratic sequence is 2n².

What is quadratic sequence?

The ordered sets of numbers known as quadratic sequences are based on the rule n^2 = 1, 4, 9, 16, 25,.... (the square numbers). Every quadratic sequence has a n^2 term.

Consider, the given quadratic sequence

2, 8, 18, 32, 50, ...

we have to find nth term of this quadratic sequence ; 2 , 8 , 18 , 32, 50, ...

To find the nth term, we have to find the relation between the given terms.

here we see,

1st term = 2 = 2 × 1 × 1 = 2 × 1²

2nd term = 8 = 2 × 2 × 2 = 2 × 2²

3rd term = 18 = 2 × 3 × 3 = 2 × 3²

4th term = 32 = 2 × 4 × 4 = 2 × 4²

similarly 5th term = 2 × 5² = 2 × 25 = 100

...........

so nth term = 2 × n² = 2n²

Hence, the nth term of the given quadratic sequence is 2n².

To know more about quadratic sequence, click on the link

https://brainly.com/question/29721348

#SPJ1

I WILL GIVE BRAINLIEST TO THE CORRECT PERSON AFTER 2 PEOPLE ANSWERRRR

Answers

Answer:

x=42

Step-by-step explanation:

Figure A has been scaled by 2/7, so we know that[tex]x * 2/7 = 12.[/tex] Multiplying both sides by 7 gives us [tex]2x = 84[/tex]. Dividing both sides by 2 gives us that x = 42. This is our answer.

Answer: 42

Step-by-step explanation:

2/7x=12

x = 12 * 7/2

x=84/2

x=42

Sharon started with $42 in her bank account and
added $16 per week. Neil started out $70 in debt and deposited $30 per week. Determine how many weeks it will take them to have saved the same amount of money.

Answers

Answer:

8 weeks

Step-by-step explanation:

The two equations I got from this are y=16x+42 and y=-70+30x

I graphed both equations online to see what the intersection would be the intersection between both equations is (8,170). I think that this means that in 8 weeks they would both be at 170 dollars, so I think that it will take them 8 weeks to have the same amount of money saved

(if wrong, im sorry..)

The number of weeks it will take them to have saved the same amount of money will be 8.

What is a linear equation?

A connection between a number of variables results in a linear model when a graph is displayed. The variable will have a degree of one.

The linear equation is given as,

y = mx + c

Where m is the slope of the line and c is the y-intercept of the line.

Sharon began with $42 in her financial balance and added $16 each week. Neil began $70 underwater and kept $30 each week.

Let 'x' be the number of weeks and 'y' be the total amount. Then the equations are given as,

y = 16x + 42              ...1

y = 30x - 70             ...2

From equations 1 and 2, then we have

30x - 70 = 16x + 42

14x = 112

x = 8

The number of weeks it will take them to have saved a similar measure of cash will be 8.

More about the linear equation link is given below.

https://brainly.com/question/11897796

#SPJ2

Select all of the equations below that are equivalent to:
17 - k = 52
Use properties of equality.

Answers

Answer:

there are no equations below...

Step-by-step explanation:


a = ?
b= ?
C = ?
A = ?
B = ?

Answers

Answer:

a = 13 ftb = 16 ftc = 21 ftA = 39°B = 51°

Step-by-step explanation:

You want the complete solution (side lengths and angles) for a right triangle with leg lengths a=13 ft and b=16 ft.

Solution

Since the two leg lengths are given, it is convenient to use the inverse tangent relation to find one of the acute angles.

  Tan = Opposite/Adjacent

  tan(A) = a/b

  A = arctan(13/16) ≈ 39°

  B = 90° -A = 51°

The hypotenuse can be found using the Pythagorean theorem, or it can be found using trigonometry. We have just computed angle A, so we can use that value to find the hypotenuse of the triangle.

  Cos = Adjacent/Hypotenuse

  Hypotenuse = Adjacent/Cos

  c = b/cos(A) = 16/cos(39.093859°) ≈ 21 . . . . feet

Then the solution is ...

a = 13 ftb = 16 ftc = 21 ftA = 39°B = 51°

__

Additional comment

Note the calculator is set to DEG mode so the angles are reported in degrees.

The hypotenuse is found using the original full-precision value of the angle, not the rounded value required to answer the problem statement.

Show how u got all the answers
Solve for y

1. -2y + 7 = -5


Solve for x



2. -3(x + 5 = -9




3. X+(/2.5= -7.79

Solve for n


4. 3.33 + 2n = -7

Answers

Answer: 1. y = 6

2. x = -2

3. X = -10.29

4. n = -5.165

Step-by-step explanation:

1. -2y + 7 = -5

-2y + 7 - 7 = -5 - 7

-2y = -12

y = 6

2.-3(x + 5) = -9

3(x+5) = 9

x+5 = 3

x = 3 - 5

x = -2

3. X+2.5= -7.79

X= -7.79 - 2.50

X = -10.29

4. 3.33 + 2n = -7

3.33 - 3.33 + 2n = -7 - 3.33

2n = -10.33

n = -5.165

what is one plus 59 plus 666662

Answers

Answer:

66,726

Step-by-step explanation:

Answer:

666,722

Step-by-step explanation:

1 + 59 + 666,662

= 60 + 666,662

= 666,722

i hope this helped

The sum of three consecutive integers is 42. Which of the equations could represent this relationship? Select the two correct answers. x + (x + 1) + (x + 2) = 42 x + (x + 2) + (x + 4) = 42 (x minus 1) + x + (x + 1) = 42 (x minus 2) + x + (x + 2) = 42 x + 2 x + 3 x = 42

Answers

The two equations that can represent the relationship is

i. x +( x+1) + (x+2) = 42 and

Ii. (x-1) +x + (x+1) = 42 ( option A and C)

What are consecutive integers?

Consecutive integers are those numbers that follow each other. They follow in a sequence or in order. For example, a set of natural numbers are consecutive integers.

For example, 4,5,6,7 are consecutive integers. This means that the difference between two consecutive numbers is 1.

If the first number is x, then the second number is (x+1 ) and the third number is (x+3)

The sum of the three number is x +( x+1) + (x+2) = 42

if the second number is x, then the first number is (x-1) and the third number is x+1

Therefore the sum of the three numbers can also be written as (x-1) +x + (x+1) = 42

learn more about consecutive numbers from

https://brainly.com/question/28669351

#SPJ1

find an equation of the tangent line to the graph of y = e−x2 at the point 2, 1 e4 .

Answers

i am so glad to see that you 12

50 POINTS IF ANSWERED PLS!!!!!
triangle ABC is an isosceles triangle. find the missing angles and side measures.

Answers

Angle A = 40 degrees

Angle C = 70 degrees

Side AC = 12 cm

A regular polygon has its exterior angles all equal to 5⁰ Find the number of sides of the polygon.​

Answers

calculate the size of the exterior and interior angles of all the different polygon.

how do i find the answer

Answers

The value of the angles of the given quadrilateral are;

8) ∠X = 124° = ∠W

∠Y = 56° = ∠Z

9) ∠J = 44° = ∠K

∠L = 136° = ∠M

How to find the angles of a quadrilateral?

The sum of angles of a quadrilateral is equal to 180 degrees. Now, in the quadrilateral given, the two angles on the slant side always equal 180 degrees. Thus;

8) From the given trapezium, we can use the definition above to say that;

∠X + ∠Y = 180°

Thus;

(13x - 7)° + (8x - 2)° = 180°

21x - 9 = 180

21x = 189

x = 189/21

x = 9

Thus;

∠X = (13(9) - 7)°

∠X = 124° = ∠W

∠Y = 180° - 124°

∠Y = 56° = ∠Z

9) From the above, we can apply the same to this quadrilateral to get;

7x + 2 + 25x - 14 = 180

32x - 12 = 180

32x = 180 + 12

32x = 192

x = 192/32

x = 6

∠J = (7(6) + 2)

∠J = 44° = ∠K

∠L = 180 - 44

∠L = 136° = ∠M

Read more about Angles of a quadrilateral at; https://brainly.com/question/16941531

#SPJ1

Which is a survey?

a study that collects data on every subject in a sample
the data collected from a population
the questions used for a sample
the questions used for a population

Answers

Answer:
A study that collects data on every subject in a sample
Hope this helps!

-1 1/6 divided by 1/4=
Pls help me

Answers

Answer:

-14/3 or -4.67

Step-by-step explanation:

division.

The answer is -22/3 hope this helps

Which system of equations can be represented by this matrix?

Answers

Answer:

answer is c

Step-by-step explanation:

I learned matrix

The number 651 is what percent of 700?

Answers

Answer:

93%

Step-by-step explanation:

651/700

Answer: 93%

Step-by-step explanation:= (

(651 × 100/700) × 1/100 = 93/100

2X-Y=4
x=4-y
please explain each step

Answers

Step-by-step explanation:

2X-Y=4 ---------(1)

x=4-y---------(2)

since x = 4 – y just substitute for eqn 1

2(4–y) – y = 4

8 – 2y –y=4

8 –3y = 4

–3y=4–8

–3y=–4

y=–4/–3

y= 4/3

since y = 4/3 just substitute for y in eqn (2)

x=4–4/3

multiply both sides by 3

3x=12–4

3x=8

x=8/3 or 2 2/3

The registration fee for a used car is 0.6​% of the sale price of ​$6,300. How much is the​ fee?

Answers

Answer: 37.80

Step-by-step explanation:

Here are summary statistics for the weights of Pepsi in randomly selected cans: n = 36, x-bar = 0.82407, s = 0.00567. Use a confidence level of 95% to complete parts (a) through (d) below.

A) Identify the critical value t a/2 used for finding the margin of error.
T a/2 =

B) Find the margin of error

Answers

The margin of error, a statistic, is a measure of how much random sampling error there is in survey data.

The margin of error exists 0.07728.

What is meant by margin of error?

A statistic known as the margin of error describes how much random sampling error there is in survey data. Less faith should be placed in a poll's results representing the outcome of a population census as the margin of error increases.

A survey's margin of error, also known as the confidence interval, is a measurement of error in the data, particularly when the sampling method of a survey is used. This indicator lets researchers know to what extent survey findings should be taken as representative of the entire community under study.

Given : n = 36

x-bar = 0.82407

s = 0.00567

Confidence level 95%

The 2 - critical Valve = 2.03

A) Let the equation be

[tex]$S F=\sqrt{\frac{\bar{x}(1-\bar{n})}{n}}[/tex]

substitute the values in the above equation, we get

[tex]$\Rightarrow \sqrt{\frac{(0.82412)(1-0.82412)}{100}}$$[/tex]

S E  = 0.03807

B) Margin of error = (0.03807)(2 × [tex]I_2[/tex])

Margin of error = 0.07728

To learn more about margin of error refer to:

https://brainly.com/question/10218601

#SPJ1

Expand (1 + √2)(3-√2) ​

Answers

Answer: 1⋅3+1(−√2)+√2⋅3+√2(−√2)

Step-by-step explanation:

Other Questions
graph the function: f(x) = {x+1 if x Richard and Teo have a combined age of 28. Richard is 13 years older than twice Teos age. How old are Richard and Thiago? A group of friends wants to go to the amusement park. They have no more than $80 to spend on parking and admission. Parking is $14.75, and tickets cost $11.25 per person, including tax. Write and solve an inequality which can be used to determine xx, the number of people who can go to the amusement park. When a member of a limited liability company guarantees payment of a loan to the firm, the member is personally liable for the obligation.a. Trueb. False Case Study: Proposing Education Policy SolutionsProject: Opening Statementplease look at the image and help!!! Major geological and biological events of the past are used by scientists to describe the. An ecosystem is unlikely to be limited by the supply of _____ because it is obtained from the air. you are doing a biochemical analysis of molecules from cells from patients with a certain disease compared to cells from control patients who do not have the disease. you find that patients with the disease have unusually high levels of cytosine molecules with ch3 groups attached to their cells. which modification has taken place in the cells from the disease patients? Question 3 Multiple Choice Worth 10 points)(04.05 LC)DA hockey player made 88% of her goal attempts last season. The coach wants to estimate the number of goals the player will make out of 10 attempts in a game and decides torun a simulation. Which of the following could be a representation of the events for the simulation?O Assign the numbers 00-88 to represent a made goal and the numbers 89-99 to represent a missed goal.O Assign the numbers 1-9 to represent a made goal and the number 10 to represent a missed goal.O Assign the numbers 1-88 to represent a made goal and the numbers 89-100 to represent a missed goal.O Assign the numbers 0-8 to represent a made goal and the number 9 to represent a missed goal. the perimeter and the width of a rectangle are 64 m and 2 m, respectively. what is the area of the rectangle? Will warmer oceans be better or worse at absorbing CO2, and why?Please help, giving brainliest what caused the growth of regulatory agencies around the transition from the nineteenth to the twentieth century? John earns $22 per hour for a regular 40 hour work week. Any hours worked over 40 hours are paid at time and a half.What is John's gross pay if he worked 44 hour this week? i only need 8 someone pls im desperate i will mark you brainliest when i can How domodest orextremeenvironmentalchanges affectthe long-termstability of anecosystem? Can someone give me Spanish songs that talks about working out routines or exercising? For my spanish class 3 events (occurrences BEFORE the settlment) that caused the english settlment of america 7. How many possible combinations are possible if you choose exactly 4toppings for a pizza from the choices below? You may use your formula sheetor Desmos formulas to show your work.pepperoni, pineapple, sausage, onions, frogs. peppers, ham, fish, olives.mushrooms, tomatoes The top of a ladder rests at a height of 12 feet against the side of a house. If the base of the ladder is 9 feet from the house, what is the length of the ladder? Round to the nearest foot. 41. The term PROTESTANT was created to describe...A) Christian who protested against the Lutheran faithB) Christian who protested against the Catholic ChurchC) Christian who supported the Catholic FaithD) Republicans who protested against the Lutheran faith