4. Explain how, or even if, the Earned Value method of measuring project progress could be used to accurately measure progress for individual work packages

Answers

Answer 1

It is true that Earned Value method is used to measure a project progress because its work by measuring individual work packages.

The Earned Value method is a standard analyst method used to measure a project's progress at any point in time.

The formula used to Earned Value is by dividing the total project budget by the number of work blocks.

In conclusion, It is true that Earned Value method is used to measure a project progress because its work by measuring individual work packages.

Read more about Earned Value method

brainly.com/question/14318045


Related Questions

Hep help please straightforward answer please thanks thanks

Answers

Answer:

C

Explanation:

Michelle is typing an e-mail to team members. The e-mail includes some issues that were discussed during a meeting and decisions that were made. Michelle is writing the _____.

Answers

Answer:

issues that were discussed in the meeting

Explanation:

True or False: Anything less than a full bottle shouldn't be considered in inventory at all.

Answers

Answer:

false and not true

Explanation:

Anything less than a full bottle should be considered in the inventory. Thus, the given statement is false.

What is inventory par level?

Using the Periodic Automatic Replacement (PAR) inventory control system, you may determine the amount of inventory you need to keep on hand to meet demand. The ideal inventory stock to have on hand following each order delivery is determined by the PAR level.

The usual quantity of an ingredient you anticipate having on your shelves at any given moment is known as an inventory par level. It's straightforward: If you ordered 5 jars of mayonnaise but only have 2, you know you need to get 3 more.

While receiving your inventory, check your system's inventory price again, For bookkeeping, code your invoices. Any outdated prices in your system should be changed, Add the delivered goods to your order history.

Therefore, the given statement is false.

Learn more about the inventory par level, here:

https://brainly.com/question/28340947

#SPJ2

Which type of listening occurs when we are focused on sharing our own point of view instead of listening to someone else?​

Answers

Answer:

pwede ba po tagalog

nalang pwede

A key tool used for problem statement maturing (usually in conjunction with the customer is)

Answers

A design thinking is the key tool used for problem statement maturing, usually in conjunction with the customer.

Design thinking refers to a process which aims to solving problems by prioritizing the consumer's needs above all else.

The main benefit of the process is that its helps firm to identify, understand and address the need or problems of the businesses and their customer.

In conclusion, the design thinking is the key tool used for problem statement maturing, usually in conjunction with the customer.

Read more about design thinking

brainly.com/question/24596247

What affects the egg coagulation in custards and creams!

Answers

What affects the egg coagulation in custards and creams!
Answer: Sugar is also important to custard as the addition of it in a recipe results in a softer custard. Sugar also increases the coagulation temperature and time. Don't dump the sugar directly onto the eggs and let it sit; this causes the yolks to "burn" into hard little lumps that detract from your creamy custard.
A small amount of cornstarch (or flour) added to the recipe helps with this. The starch molecules slow protein coagulation, making the egg proteins more resistant to overcooking and curdling (clumping).

In a custard or pudding, this coagulative property is responsible for the custard texture and mouthfeel. As one source says, “Eggs are the main thickener in most custard and the yolks make them smooth and rich.”3 Starch is often added to custard to slow the process of coagulation to help prevent overcooking the mixture.

Egg proteins denature and coagulate over a wide temperature range. Natural protein consists of complex, folded and coiled individual molecules. Loose bonds across the folds and coils hold each protein molecule in a tight, separate unit. These bonds can be disrupted when exposed to heat or acid, or by physical means such as whipping, causing the protein to denature.

Coagulation or gelation in eggs can be achieved by several different means, including heat (protein denaturation), mechanical (beating or chipping), sugar (raises the temperature for coagulation), acids (decrease temperature where coagulation is achieved), alkali (high alkali can induce gelling of egg white).4, 7

When two unfolded protein molecules with their oppositely charged ends approach each other, the molecules unite. Essentially, millions of protein molecules join in a three-dimensional network, or simply, they coagulate, causing the egg product to change from a liquid to a semisolid or solid.7

Coagulation influences egg products’ ability to foam, seal, thicken and more. This thickening capacity impacts viscosity in products such as pie fillings (i.e., pumpkin5) and desserts, such as cheesecake, where a lack of eggs or substitutions can negatively impact final product height, appearance, firmness and mouthfeel.6

There are more than 40 different proteins in a whole egg, some only located in the white and others predominantly in the yolk. These proteins influence the rate of denaturation and coagulation. Egg white protein coagulates between 144° F and 149° F (62.2° C and 65° C); egg yolk protein coagulates between 149° F and 158° F (65° C and 70° C); and whole egg protein coagulates between 144° F and 158° F (62.2° C and 70° C). However, a number of variables influence the rate of coagulation, as well as the ability of the proteins to remain in the three-dimensional network.

examples of non good services

Answers

Answer:

Examples of non-economic goods are air, water, sunshine, etc. The concept of non-economic goods is relative to place and time.

Explanation:

Non-economic goods are called free goods because they are free gifts of nature. They do not have any price and are unlimited in supply.

On May 31, 2010 Amex Corporation acquired all of 10,000 shares of Luck’s outstanding common stock by paying Br 400,000 cash and issuing 20,000 shares of Br 15 par common stock having a market value of Br 40 per share to Luck’s stockholders. In addition, Br 300,000 is contingent up on the achievement of Br 1,000,000 profit margin in the next annual period. The fair value of contingent consideration was Br 100,000. • Separate balance sheets of Amex Corporation and Luck Company on May 31, 2010, together with current fair values of Luck’s identifiable net assets are given on the next slide:​

Answers

Answer:

27. Answer the following question in the negative.

Est-ce qu'il y a quelqu'un à la réception de l'hôtel?

Explanation:

gold j]ludkcmmmmm it is ood know

how it can be used in addition to showing skills –use the account and debit card?

Answers

Answer:What happens when you use a debit card and use credit at the register?

Explanation:When you run your transaction as credit using your debit card, you are still authorizing a debit from your checking account. You will never be charged interest or receive a bill for doing this. Of course, choosing credit at the point-of-sale will not help you build your credit.

Work hours are unlimited for which of these as it pertains to child labor laws?
O A. Ages 12-16
O B. Ages 16-17
O C. Ages under 14
O D. Ages 14-15

Answers

Answer: D

Explanation: Im not sure if im correct but i believe its D

One goal of the Occupy Movement was to encourage the practice of bank bailouts.
Group of answer choices

True

False

Answers

True I think I’m not sure :/

Last year during the beginning of the Pandemic, name 5 household products people were hoarding?

Answers

Answer: Toiletry, Food, Cleaning items, Water

Explanation:

toilet rolls, food, water, cleaning products

Learners with a _____ learning style prefer reading, writing, and speaking. naturalistic logical/mathematical verbal/linguistic none of the above

Answers

Answer:

Verbal/linguistic learners prefer learning activities that involve reading, writing, and speaking.

Explanation:

Suppose the supply and demand equation are given as follow:
Demand: Qd=115-2*p
Supply: Qs=13+3*p
What's the equilibrium price? (Hint: enter your answer in 2 decimal places)
Your Answer:
Answer

Answers

Answer:

$20.40

Explanation:

The supply and the demand equations are given as:

Qd = 115 - 2p

Qs = 13 + 3p

The equilibrium point is when both equations are equal.

So, we have

115 - 2p = 13 + 3p

Collect like terms

3p +2p = 115 - 13

5p = 102

Divide both sides by 5

p = 20.40

Hence, the equilibrium price is $20.40

WILL GIVE BRAINLIEST
Refer to Figure 33-2. If the economy starts at O and moves to R in the short run, the economy


a) moves to O in the long run
b) moves to P in the long run
c) moves to Q in the long run
d) moves to R in the long run

Answers

Answer:

c c c c c c c  c.             give brainliest to guy above

Explanation:

If the economy starts at O and moves to R in the short run, the economy moves to Q in the long run. Thus the correct option is C.

What is the Economy?

The economy of any country is determined by the ratio of production and consumption that takes place within a year and evaluates the flow of funds in the market by analyzing the purchasing parity of an individual.

The strongest and worst results for an economy are reflected in changes in SRAS. Decreased prices, lower unemployment, and more productivity result from an increase in SRAS.

We get more of what we dislike most as SRAS declines, such as fewer items, greater unemployment, and higher costs. Since the economy has moved from the R to the Q point and AD has fallen from AD1 to AD2 denotes the movement in the short run.

Therefore, option C is appropriate.

Learn more about the Economy, here:

https://brainly.com/question/2421251

#SPJ2

Bonnie is going to purchase a billboard to promote her new restaurant. She needs to calculate her gross rating points. What two factors does she need to know

Answers

Given what we know, in order for Bonnie to calculate her "Gross Rating Points" or GPRs, she will need to know how much of the population her ad will reach and how often they will view it.

What are gross rating points?Gross rating points are a system used to measure the effectiveness of ads. In most cases, they are used in a predictive sense to measure how effective an ad may be, then used to measure how effective they were, and offer a before and after comparison.

What factors are used to calculate GPRs?In order to calculate the gross rating points, we need to know two factors. The first is the number of people or percentage of the target market, that is reached by the ad.The second is the frequency by which these individuals will view the ad.

Therefore, we can confirm that to calculate her GPRs for the billboard ad she wishes to purchase, bonnie will need to know how many people see the billboard each day, and how many times they do so.

To learn more about GPRs visit:

https://brainly.com/question/7463919?referrer=searchResults

If a monopolist's production process has economies of scale and average cost exceeds marginal cost, then _____.

Answers

If a monopolist's production process has economies of scale and average cost exceeds marginal cost, then the government should make the price equal to the marginal cost.

Monopolies are businesses that are dominated by few people in the industry. They have little competition from others and have high barriers to entry.

They can sometimes reduce production to increase the price of their goods and services.

The government can regulate the activities of monopolies by making their price equal to the marginal cost.

Learn more about monopolies here:

https://brainly.com/question/13113415

The process of packing 316 ounce bottles of Hershey chocolate syrup in super size packages like those sold at Sam’s and Costco is an example of what type of packaging… Is it adaptive packaging allocating sorting out accumulating or accruing

Answers

The chocolate syrup in super size packages is an example of accumulating type of packaging

Basically, packaging refers to the process of boxing or wrapping a product is offered for sale.

Accumulating packaging is the type of packaging described in the question.

Majority of accumulating package in factory are done by automated machines.

In conclusion, the chocolate syrup in super size packages is an example of accumulating type of packaging

Read more about packaging

brainly.com/question/14378177

Which of the following will shift the
LRAS Curve to the left?
A. increase quantity of laborers
B. decrease in quantity of laborers
C. increase quality of laborers

Answers

Answer: B

Explanation:

Bruno Company had a $200,000 beginning balance in bonds payable and a $210,000 ending balance in bonds payable. During the year, Bruno paid off $100,000 of bond liabilities. Based on this information alone, Bruno's statement of cash flows would include a ______ from financing activities.

Answers

lose

Explanation:

if he start the company with 200000 beginning+10000 which

will be 210000 after he paid bond 100000 he will having balance of 110000

The production report for Glenway Company for February contained the following information: Work in process, beginning of the month - 3,500 units; 1 / 5 completed Units completed and transferred to finished goods - 25,000 Work in process, end of month - 4,000 units; 1 / 4 completed Production costs for the month were: materials - $25,325; labor - $20,175; overhead - $38,950. Costs in beginning work in process were $5,250. What is the cost per equivalent unit?
a. $3.45
b. $3.59
c. $3.20
d. $3.25

Answers

Based on the information the cost per equivalent unit $3.45.

First step is to calculate the units produced During Month

Units Completed and Transferred out 25,000

Work in Progress End of Month 1,000

(4000 × 1/4)

Units Produced During Month  26,000

(25,000+1,000)

Second step is to calculate the total costs for the month

Materials $25,325

Labor $20,175

Overhead -$38,950

Costs in beginning work in process $5,250

Total Costs For Month $89,700

Third step is to calculate the cost per unit

Cost per Equivalent Unit =$89700/26000

Cost per Equivalent Unit=$3.45

Inconclusion the information the cost per equivalent unit $3.45.

Learn more about cost per equivalent here:https://brainly.com/question/3521949

David Davis plans to save $2,735 every year for the next eight years, starting today. At the end of eight years, David will turn 30 years old and plans to use his savings toward the down payment on a house. If his investment in a mutual fund will earn him 12.0 percent annually, how much will he have saved in eight years when he buys his house

Answers

Answer:

Denizen 3 4 and a great job time to for a the first time first aid kit the meaning of ghilli in a row to get the 5 to the 8th and then she says that she 38 the meaning that she should have a pool for her and the rest of her family head is of her own 4 who will not be available for the next one in night and or next at least the next other two nights as she is back at night and she is going out for a couple weeks and a great half birthday day for her birthday present so she can bring 5 500 on the on going 3

Explanation:

2 increase in the National College at Lahore 30th in September and 3rd 3 is a holiday in the UK for a couple week holidays holiday and the bear episode of a year is 4 up with and a in a advance bed booking form and the holiday accommodation for your child needs to be honest I have to read Allah and help you with you are as good as good as you can remember the first one is a bit more of 6 for her but you have a lot of money left for the me in the National capital 2176218754 3 and of 3 episode of my slow recovery and I a few days to 786 my back and the Caribbean world is a good 3 episode and I have been been working with a few people different and to the point of getting back to the office of profit of a sudden he is not working I properly managed made the best possible way of doing this to happen to her room with the help of the year but have to be honest honest and I will be back in the next couple of couple weeks with a couple in a row with a couple of days ago 5 6th June episode of puppeteer the meaning of ghilli in a row for the person in who is was not able 7 8 I a a I bit few couple few few couple few like of of like like of a of like of of a of like of of a of like months days years months days months years months days months years months days years months days months years months years days months years months years months

Last year, Joan purchased a $1,000 face value corporate bond with an 11% annual coupon rate and a 25-year maturity. At the time of the purchase, it had an expected yield to maturity of 11.96%. If Joan sold
the bond today for $1,154.91, what rate of return would she have earned for the past year? Round your answer to two decimal places.

Answers

Joan's bond receivable has earned a 15.49% rate of return for the past year.

Data and Calculations:

Face value of the corporate bond = $1,000

Annual coupon rate = 11%

Maturity period = 25 years

Expected yield too maturity (YTM) = 11.96%

Current bond's price = $1,154.91

The rate of return earned since last year = 15.49% {($1,154.91 - $1,000)/$1,000}.

Thus, Joan's bond receivable has earned a 15.49% rate of return for the past year.

Learn more about yield to maturity and rate of return on corporate bonds here: https://brainly.com/question/15851749

A(n)______allows students to study more specific topics within their majors.
A. specialization
B. requirement
C. minor
D. integration

Answers

Answer: The answer would be a interrogation

Explanation:

Five-A-Day, a company that produces and distributes organic vegetables for grocery stores, wants to market its vegetables in such a way that children will want to buy them. To accomplish this, the company creates an advertising campaign that features children dressed up in vegetable costumes attending a Halloween party and eating vegetables and dips as a snack. The company also packages cut up vegetables in grab-and-go containers in fun shapes and colorful designs to attract children's attention in the grocery store. Which marketing function does this scenario most closely describe?
A. grading
B, buying
C. selling
D. promoting
E. marketing research

Answers

The marketing function that this scenario best describes is marketing research, which is performed to collect data that will assist in the development of the company's marketing strategy.

We can see that Five-A-Day conducts marketing research by creating advertising campaigns that encourage the consumption of its products to its target audience, which are children.

Therefore, marketing research is an essential step for companies to segment their market through important information about the consumer's profile, preferences and needs.

In this way, the company makes better strategic decisions to increase its market position.

The correct alternative is letter E.

Find out more information about marketing research here:

https://brainly.com/question/24906199

A problem statement in an analytical report is most effective when it is ________.

subtly introduced in the body of the report

written in a friendly tone

unambiguous and precisely defined

lengthy with detailed background and explanations

Answers

Answer:

subtly introduced in the body of the report

Explanation:

I hope it helps to you:-)

The most effective way to introduce a problem statement in an analytical report is in the report's body.  Thus option (A) is correct.

What is the statement?

Statements are sentences that express a fact, idea, or opinion. Statements do not ask questions, make requests or give commands. They are also not utterances. Statements are sentences that express a fact, idea, or opinion. Statements do not ask questions, make requests or give speech acts. They are also not exclamations.

A problem statement, in its most basic form, identifies the issue or impact you seek to address through your work. This assertion must be precise, short, and identify a quantifiable result. In research, a problem statement is a description of the problem that needs to be investigated. What issue is the research trying to solve

Therefore, Thus option (A) is correct

Learn more about the statement here:

https://brainly.com/question/2285414

#SPJ2

Gerrald Express is a partnership business registered in Singapore. The partners are Glenn and Kim. Each of the partners contributed $50,000 as capital to the partnership and they share equally in the profits and losses.

The partnership carries on the business of marketing services. In the financial year ended 31 December 2020, the partnership recorded a net loss of $79,000 after charging the following items of expenses:

Interest on capital paid equally to the partners $5,000
Glenn salary and bonus 12,000
Kim salary and bonus 15,000
Kim’s airfares for business purposes 4,800
Glenn’s taxi fare reimbursements for business 1,200
Motor car expenses reimbursed to employees 3,000
Depreciation 6,000
Interest on loans to fund operating expenses 2,800

Besides his involvement in partnership business, Glenn is also the Executive Officer of a medium size Company in Singapore. He was paid annual remuneration of $78,000 for the year ended 31 December 2020.

His spouse has no income for last year and has 2 children aged 19 and 12. The son is serving National Service and Glenn did not perform any active NS training in the previous year.

Required:

a) Compute the amount of tax adjusted profit or loss of the Gerrald Express partnership for the year of assessment 2021; [8 marks]

b) Compute the assessable income of Glenn for the year of assessment 2021; [12 marks]


c) State the major difference in a partner’s liability to utilise the losses arising from a partnership and from a limited liability partnership. [10 marks]

Answers

Answer:

i dont knowpls mark me as brinlest

Explanation:

2. The case says that Kayem Foods is not meeting its profit targets. Why is it difficult for this firm to make money in this market?

Answers

Companies often set target for themselves.  The reasons why it is difficult for this firm to make money is that;

As a result of poor demand for the products It can be also be like due to the power  or prestige gained over the years by the supermarkets is depreciating.This can be due to the small price margin or the price competition from other manufacturers.Losses encountered via the issue of  Private LabelPoor marketing and advertisement strategy and poor budget allocation for it.

Kayem Foods is a very popular brand. It is known to be a 4th generation family owned business. It has it headquartered in Chelsea, MA.

It is commonly known in the world to be the biggest processed meat company that is found in New England.  They are based on natural casing, fully cooked and fresh sausage etc.

Learn more about Food from

https://brainly.com/question/25884013

How to make your own website ?

Answers

Answer:

Use visual studio code

Explanation:

You want to then make HTML code and CSS code 2 different files that corillate together and you need a header, footer, main, functions is CSS etc

which situation would normally involve long-term financing?

Answers

Which of the following would normally involve long-term financing?

Purchase of modern equipment;
Long-term financing is used for major purchases that are financed for a time period greater than one year such as new product development, building or purchasing new facilities, and replacing capital equipment.
Other Questions
Please guys I have 10 maybe 20 minutes to get this finished What actions can you, as an individual, take to conserve water? find 4/5 x 1 2/3?? please help! HEEEEELPMusic in Joyce Carol Oates' "Where Are You Going, Where Have YouBeen?" is best categorized as.A- symbolB- archetypeC- motifD- trope y=2x+7y=5x7x=y= Please help!!!! 100 POINTS AND BRAINLIEST Write an argumentative essay in which you state and defend a claim about whether it is ethical to target uninformed consumers.5 pls :) They were _________ to pay the rent, and were evicted from their home. Read the excerpt from Animal Farm and the passage on the history of the Soviet Union. In glowing sentences he painted a picture of Animal Farm as it might be when sordid labour was lifted from the animals' backs. His imagination had now run far beyond chaff-cutters and turnip-slicers. Electricity, he said, could operate threshing machines, ploughs, harrows, rollers, and reapers and binders, besides supplying every stall with its own electric light, hot and cold water, and an electric heater. By the time he had finished speaking, there was no doubt as to which way the vote would go. But just at this moment Napoleon stood up and, casting a peculiar sidelong look at Snowball, uttered a high-pitched whimper of a kind no one had ever heard him utter before. At this there was a terrible baying sound outside, and nine enormous dogs wearing brass-studded collars came bounding into the barn. They dashed straight for Snowball, who only sprang from his place just in time to escape their snapping jaws. In a moment he was out of the door and they were after him. Too amazed and frightened to speak, all the animals crowded through the door to watch the chase. Snowball was racing across the long pasture that led to the road. He was running as only a pig can run, but the dogs were close on his heels. Suddenly he slipped and it seemed certain that they had him. Then he was up again, running faster than ever, then the dogs were gaining on him again. One of them all but closed his jaws on Snowball's tail, but Snowball whisked it free just in time. Then he put on an extra spurt and, with a few inches to spare, slipped through a hole in the hedge and was seen no more. During the second half of the 1920s, Joseph Stalin set the stage for gaining absolute power by employing police repression against opposition elements within the Communist Party. The machinery of coercion had previously been used only against opponents of Bolshevism, not against party members themselves. The first victims were Politburo members Leon Trotskii, Grigorii. Part ARead this sentence from the passage.The All-Star Game, a single baseball game held halfway through the 162-game major league season, pits the best players from one league against the best players from the otheror at least that's what it's supposed to do.How does the author use the sentence to advance his point of view in the passage?by using facts to enhance his credibilityby using words that call a claim into questionby using language that persuades the reader to agreeby using a sarcastic tone to create interest for the reader How would you find the average rate of change between two pointson a curve? The formula that relates the length of a ladder, L, that leans against a wall with distance d from the base of the wall and the height h that the ladder reaches up the wall is L = StartRoot d squared h squared EndRoot. What height on the wall will a 15-foot ladder reach if it is placed 3. 5 feet from the base of a wall?. what powers did the federal government have under the article of confederation? 1. When is it best to solve a system of equations using graphing?2. When is it best to solve a system of equations using substitution?3. When it is best to solve a system of equations using elimination? When it is You have 4/3 chocolate bars. You want to give 1/2 of the chocolate bars you have to your friend. What fraction of the chocolate bars would each of you get For health reasons, Amir wants to drink eightglasses of water a day. He's already had sixglasses. What fraction of eight glasses doesAmir have left to drink? A. 1/8 B.1/6 C. 1/4 D.1/3 Which substances are inorganic? Check all that apply.C6H12O6K2CO3C4H10C27H46OFe3O4 How did Issac Newton help progress the world in the Age of Reason, and how did his work help shape the world we see today? Estimate the quotient of 57.87 5 A) 9 B) 10 C) 11 D) 12 the technique of gradually changing _________ levels was developed by the mannheim symphonists. A population of N = 10 scores has = 50 and = 5. What is the population variance?2510 550